LDEQ Accident Number Accident Date |
Point Source(s) | Notes | Amount of Release |
91050 2006-10-02 | No iCoker Flare FE-401 (EPN 2-84)nformation given Coker Flare FE-401 (EPN 2-84) | Cause: Flaring resulted from the 3/4" drain line on the case of pump P-1983 breaking off while decon piping was being installed, causing the Coker Unit to be shutdown. Flushing oil was released from the pump casing to secondary containment but there was no release outside of the containment or to soil or water. Followup: Yes Notes: The Coker Unit was shut down and PV-901 depressured to reduce leaking while pump was isolated. Further corrective actions are being reviewed by Motiva Enterprises' legal department. | 0.2 pounds |