Home | Search | Emissions | Pollutants | About the Database |
Accident # | 144106 |
State Police # | 12-06953 |
Accident Date | 2012-10-20 |
Report Date | 2012-11-15 |
Follow-up Date | 0000-00-00 |
Follow-up: | Yes |
Pollutant | Duration | Point Source | Greenhouse Gas | Criteria Pollutant | Ozone forming chemical | Amount of Release |
1,3-Butadiene | 2h 47m | Valve packing on 10" Finished BD wharf/Tank Car loading line | NO | NO | YES | BRQ |
Accident Classified As: Below Reportable Quantity (BRQ)
At 04:35 on October 22, 2012 Motiva BPS Operators discovered the inlet block valve to RV-2960 iced over during his surveillance rounds. Motiva Site Supervisor was notified, the EST group was activated and the area was isolated. The 3/4" thermal RV protects a 10" Finished BD wharf/Tank Car loading line. The line was under 45 psig and not being used to load BD at this time. The source of the leak was the valve packing.
Once the line was depressured to 25 psig, the response team, under SCBA, used fire water to remove the ice and determine the exact source of the leak. The valve packing was tightened, and the leak was stopped at 07:22. No reportable quantities were exceeded. No mention of any pounds or gallons.
Connect With Us: