Home | Search | Emissions | Pollutants | About the Database |
LDEQ Accident Number Accident Date |
Point Source(s) | Notes | Amount of Release |
79911 2009-06-17 | FCC Unit Flare EIQ Number 5-85, FCC Flue Gas Stack Unit EIQ Number 1-85 Crude Flare EIQ Number 8-78 | Cause: Temporary loss of electricity due to stormy weather. Entire refinery shutdown. Subsequent problems restarting boilers resulted in delayed start up. Followup: No Notes: Report indicates that the power failure was unforeseen and therefore unpreventable. The 92 hour release was periodic in nature. The units were shut down and power restored. | 81.1 pounds |
79911 2009-06-17 | FCC Unit Flare EIQ Number 5-85, FCC Flue Gas Stack Unit EIQ Number 1-85 Crude Flare EIQ Number 8-78 | Cause: Temporary loss of electricity due to stormy weather. Entire refinery shutdown. Subsequent problems restarting boilers resulted in delayed start up. Followup: No Notes: Report indicates that the power failure was unforeseen and therefore unpreventable. The 92 hour release was periodic in nature. The units were shut down and power restored. |
Connect With Us: