Home | Search | Emissions | Pollutants | About the Database |
LDEQ Accident Number Accident Date |
Point Source(s) | Notes | Amount of Release |
No LDEQ Reported 2005-08-12 | Chevron Texaco Bridgeline Pipeline | Cause: During product switch from Propane to Propylene the level gauge gasket on the seal pot of the 411 L 95 C pump failed. Followup: No Notes: Pump was shut down and isolated and repaired. | 102.0 pounds |
No LDEQ Reported 2005-05-10 | Texaco Pipelines LLC AL02 Liquid meter station at ConocoPhillips | Cause: A power failure at CP caused an automatic shut down causing a 1inch relef valve to release propylene. Followup: no Notes: Installed thermal relief on the pipeline | 754.0 pounds |
Connect With Us: