Home | Search | Emissions | Pollutants | About the Database |
LDEQ Accident Number Accident Date |
Point Source(s) | Notes | Amount of Release |
85071 2010-01-11 | FCC Flare EPN 5-85 | Cause: Potential excess emissions from FCC Flare due to a power failure causing Complex II to shutdown. Followup: Yes Notes: An initial written report was sent on January 17 but is missing. Since the startup was delayed the incident was not closed out. The final all-clear notification was made. Indicated that after all units are returned to normal operations, a follow-up report was promised but is missing. Also, as part of this report, an attachment with estimated emissions was missing. |
Connect With Us: